DICKINSON RESEARCH CENTER EXPANSION/NEW EXTENSION FACILITY IN SIKESTON, MO
Sponsoring Institution
National Institute of Food and Agriculture
Project Status
EXTENDED
Funding Source
Reporting Frequency
Annual
Accession No.
1000483
Grant No.
2013-45200-21362
Project No.
MOLUDickinson2013
Proposal No.
2013-02099
Multistate No.
(N/A)
Program Code
LS
Project Start Date
Sep 1, 2013
Project End Date
Aug 31, 2015
Grant Year
2015
Project Director
Matthews, Y.
Recipient Organization
LINCOLN UNIVERSITY
(N/A)
JEFFERSON CITY,MO 65101
Performing Department
Agriculture & ENV Sci.
Non Technical Summary
Due to hiring of much needed faculty, post doctoral fellows, and graduate students the University is maxed out on office space and laboratory space, as well as functional greenhouse space. Two new programs critically need expanded space. One of these new programs is the plant pathology program. This program includes developing statewide research and extension programs that are geared towards formulating fact-based diagnosis and identification of vegetable and small fruit diseases as well as providing accurate recommendations of management strategies to improve the livelihood of Missouri residents. The current satellite Extension facility is poorly suited to accommodate the needs of the clientele in the boot heel area of Missouri. This extension office serves a large number of the underserved population in this area. The existing facility only allows enough space for office work and a very small computer lab located in a converted garage. A new facility is needed with the appropriate type of spaces, rather than having to continually rent spaces from local churches and schools to implement programs.
Animal Health Component
60%
Research Effort Categories
Basic
30%
Applied
60%
Developmental
10%
Classification

Knowledge Area (KA)Subject of Investigation (SOI)Field of Science (FOS)Percent
20501991130100%
Knowledge Area
205 - Plant Management Systems;

Subject Of Investigation
0199 - Soil and land, general;

Field Of Science
1130 - Entomology and acarology;
Goals / Objectives
1. The objective is to construct a 3,000 square foot addition to Dickinson Research Center and a 2,400 square foot greenhouse connected to Dickinson Research Center. Approximately 45% of the facility is assigned to teaching, 45% to research and 10% to extension. 2. The objective is to: 1) acquire a suitable land site, and 2) construct an 8,000 square foot facility for the Satellite Extension Office in Sikeston, MO. This facility will be used 100% by extension.
Project Methods
The following tasks shall be undertaken in order to accomplish this objective. 1. The 1890 Land-Grant Administrator shall appoint an Advisory and Oversight Committee to be active in the selection of the design consultant, providing input into the needs of the spaces, and to assist with oversight of the project. 2. The Advisory and Oversight Committee shall define the building program spaces and develop the RFQ for consultant selection. 3. The Advisory and Oversight Committee shall review all consultant submittals of statement of qualifications, short-list as necessary, conduct interviews, and negotiate a contract with the first-ranked firm. Request for approval of the design consultant shall be made to the University Administration and to NIFA. 4. The consultant of record shall begin the design process for producing construction documents in order to bid the project. 5. The Pre-Environmental Assessment shall be completed and submitted to NIFA for approval. 6. The project shall be advertised statewide for competitive bids. Pre-bid conference to be held. Bids received. 7. The bids shall be evaluated and recommendations sent to the University Administration and NIFA for approval of the construction contract. 8. Upon approval of the construction contract by NIFA, schedule the Pre- Construction conference and commence construction. Progress coordination meetings to be held. 9. Upon construction completion, conduct a punch list for any outstanding issues. 10. Once all punch list items have been completed, receive all necessary close-out documents to make final payments to the consultant and the contractor. 11. Occupants to move into the facility and begin using it. 12. Conduct an 11-month warranty to see if anything needs to be addressed within the year warranty of materials and workmanship.

Progress 09/01/13 to 08/31/14

Outputs
Target Audience: Extension and Reserach faculty, staff; students from Department of Agriculture; Minority farmers; area public high school students. Changes/Problems: Nothing Reported What opportunities for training and professional development has the project provided? During this past year, the facilities program continued to impact the future of the research and extension programs at Lincoln University. With the completion of the new aquaculture research facility, the aquaculture program was moved from a deteriorating facility to a new state-of-the-art one which will enhance the effectiveness and efficiency of the research being conducted. Major upgrades were made to the Small Animal Research Facility HVAC system and roof replacements. This enabled continued research to continue in the facility. Repairs made at various facilities continue to support the programs provided and research being conducted at these facilities. Design was completed for the small ruminant building critically needed at the Busby Farm. Bids will be forthcoming upon approval of the Pre-Environmental Assessment. No major land or equipment purchases were made during the FY13 reporting period. During this past year, the facilities program continued to impact the future of the research and extension programs at Lincoln University. With the completion of the new aquaculture research facility, the aquaculture program was moved from a deteriorating facility to a new state-of-the-art one which will enhance the effectiveness and efficiency of the research being conducted. Major upgrades were made to the Small Animal Research Facility HVAC system and roof replacements. This enabled continued research to continue in the facility. Repairs made at various facilities continue to support the programs provided and research being conducted at these facilities. Design was completed for the small ruminant building critically needed at the Busby Farm. Bids will be forthcoming upon approval of the Pre-Environmental Assessment. No major land or equipment purchases were made during the FY13 reporting period. How have the results been disseminated to communities of interest? Nothing Reported What do you plan to do during the next reporting period to accomplish the goals? A summary of activities to be undertaken during the next 12 month period relative to the 5-year plan for FY08-FY12 Grant No. 2008-45200-04424, include: Complete repairs to the Teaching Greenhouse. Contract pending approval by NIFA. (Approval received 11/4/14.) Complete the repairs/renovation to the hvac system in Small Animal Research Facility to provide a more functional and energy efficient system. Bid the construction of the small ruminant facility at Busby Farm for the Integrated Farming Systems Institute in Winter 2014/2015. Construction to be completed summer 2015. This grant has been extended until 8/31/15. A summary of all project costs incurred to date relative to the FY08-FY12 Section 1447, Facilities Grant Program, #2008-45200-04424 is as follows. Cost Item Federal Share Non-Federal Share 1. Advertising costs and ½ $14,237 $0 Building permit for the Kansas City project 2. Additional public works drawings $4,632 $0 For KC project 3. Pre-Environmental Assessment $2,900 $0 for removal of old greenhouse 4. Youth Development Camp Log $41,055 $0 Cabin repairs 5. Dickinson Research Center $21,110 $0 Parking Lot expansion design 6. Kansas City project construction $76,050 $0 Change order No. 1 7. Kansas City project construction $98,395 $0 Change Order No. 2 8. A/E services for the Kansas City $1,125 $0 Outreach Center retaining wall 9. Construction of reservoir at $99,500 $0 Busby Farm 10. QA, staking, SWPPP for $12,000 $0 Reservoir at Busby Farm 11. A/E services for design of new $146,800 $0 Aquaculture Research Facility 12. Dickinson Research Center $312,356 $0 Parking Lot Expansion (construction) 13. Youth Development Camp Log $2,378 $0 Cabin Repairs change order No. 1 14. Youth Development Camp Log $3,950 $0 Cabin Repairs change order No. 2 15. Youth Development Camp – $1,828 $0 Raise backflow preventer 16. Emergency Acquisition release of - $3,950 $0 funds for PEA for reservoir, ads for aquaculture facility consultant 17. Emergency Acquisition release of $4,646 $0 funds Dickinson Parking lot ads, printing of plans 18. New Aquaculture Facility $1,267,099 $0 (construction) 19. South Campus Ph. II Renovation $712,300 $0 20. PEA for South Campus Ph. II $2,300 $0 Renovation 21. PEA for New Farm acquisition $2,500 $0 22. New Farm Acquisition - $400,000 $780,000 9315 Tanner Bridge Road 23. A/E services for toilet room $10,688 $0 And misc. repairs at St. Louis Extension Office 24. New Laboratory renovation in $93,317 $0 Small Animal Research Facility 25. Emergency Acquisition release of $8,950.72 $0 funds for Dickinson parking lot ads, sanitary sewer bond in KC 26. Emergency Acquisition release of $21,695.59 $0 funds for new aquaculture facility ads, printing of plans 27. Emergency Acquisition release of $14,749.36 $0 funds for South Campus renovation ads, printing of plans 28. Restroom Remodel at the St. Louis $137,956.00 $0 Satellite Extension Office 29. Emergency Acquisition release of $909.67 $0 funds for emergency repairs at Youth Camp and KC Ext. office 30. Sheep Facility Roof Replacement $69,369.00 $0 at Carver Farm 31. Restroom Remodel at the St. Louis $26,043.00 $0 Extension Office – change order 1 32. Security cameras at the St. Louis $2,866.00 $0 Extension Office 33. Allen Hall floor covering replace- $14,945.00 $0 ment 34. Allen Hall floor moisture testing $488.00 $0 35. Repairs at Dickinson Research $8,261.00 $0 Center 36. Design of Small Animal Research $84,000.00 $0 Facility HVAC upgrades 37. Allen Hall Floor Covering $9,880.00 $0 Change order no. 1 38. Allen and Foster Halls Chiller $138,900.00 $0 Replacement 39. Small Animal Research Facility $48,150.00 $0 Chiller Replacement 40. Emergency Acquisition release $8,822.48 $0 of funds for chiller project ads 41. Small Animal Research Facility $9,500.00 $0 Roof design consultant 42. Small Ruminant Building Busby $62,550.00 $0 Farm design consultant 43. PEA for Teaching Greenhouse $2,500.00 $0 44. Bennett Hall New Door $14,909.70 $0 Installation 45. Solar pump enclosure at Busby $6,405.31.00 $0 Farm 46. Small Animal Research Facility $485,000.00 $0 HVAC renovation 47. Small Animal Research Facility $102,528.00 $0 Roof replacement 48. Change order no. 1 to new $16,724.07 $0 Aquaculture Facility 49. Change order no. 1 to Small $117,235.00 $0 Animal Research Facility HVAC Renovation 50. Change order no. 1 to Small $12,240.00 $0 Animal Research Facility HVAC Upgrades design consultant 51. Emergency Acquisition release $10,253.92 $0 of funds for SARF roof/hvac ads Total of FY08 – FY12 $4,756,289.25 funds released to date Balance of FY12 funds $609,932.92 Balance of EA funds $ 104,120.83 Total allocated funds FY08-FY12 $5,470,343.00 A summary of activities to be undertaken during the next 12 month period relative to this Grant No. 2013-45200-21362, include: Complete the Accessible Entrance Ramp into Founders Hall. Complete the Pre-Environmental Assessment for the Dickinson Research Center Expansion project. Send to NIFA for approval. Upon approval, proceed with advertising and bidding the project for construction. Send to NIFA for approval. Construction begins. Complete the property acquisition in Sikeston, MO, for the new Extension Office. Advertise for Statement of Qualifications from architectural/engineering firms to design the new Extension Office in Sikeston, MO. Proceed through the normal interview process and submit recommendation to NIFA for approval of the a/e contract. Complete minor repairs to existing facilities. Obtain bids and submit to NIFA. A summary of all project costs incurred to date relative to the FY13 Section 1447, Facilities Grant Program, #2013-45200-21362 is as follows. Cost Item Federal Share Non-Federal Share 1. Accessible Entrance Ramp into $58,400 $58,400 Founders Hall 2. Architectural/engineering consultant $126,600 $0 for Dickinson Research Center Expansion project 3. EA funds released for advertising $5,087.98 $5,087.98 Founders Hall accessible entrance ramp Total of FY13 $ 190,087.98 funds released to date Balance of FY13 funds $ 910,073.00 Balance of EA funds $ 44,912.02 Total allocated funds FY08-FY12 $1,145,073.00

Impacts
What was accomplished under these goals? The following is a performance report for the work during the past twelve months (9/1/2013 to 8/31/2014) as related to the objectives identified and approved with the FY08-FY12 NIFA grant proposals. The grant number assigned to this five-year block of funding is 2008-45200-04424. New Aquaculture Facility at Carver Farm a. New Aquaculture Facility Construction Wisch & Vaughan Construction, Jefferson City, MO $1,267,099 July 6, 2011 b. New Aquaculture Facility Construction change order no. 1 Wisch & Vaughan Construction, Jefferson City, MO $16,724.07 May 29, 2014 Original work is completed, change order work is 5% completed. Change order is to replace lighting fixtures in the wetlab, and misc. venting/insulation for condensation issues. Work to be completed by 11/30/14. Small Animal Research Facility Roof Replacement a. Roofing Consultant for design specifications RoofTech Consulting, Highland, IL $9,500.00 September 27, 2013 Design work is 100% completed. Project was advertised and bid, construction contract has been awarded. b. Construction contract for roof replacement Missouri Builders, Inc., Jefferson City, MO $102,528.00 May 29, 2014 Work is scheduled to begin by 8/25/14. Small Animal Research Facility HVAC Renovation a. Small Animal Research Facility HVAC upgrades McClure Engineering, Inc. St. Louis, MO $84,000.00 March 27, 2013 b. Small Animal Research Facility HVAC upgrades, change order no. 1 McClure Engineering, Inc. St. Louis, MO $12,240.00 May 29, 2014 Design work is 100% completed. Project was advertised and bid, construction contract was awarded. Consultant contract is 80% completed. c. Construction contract for hvac renovation Harold G. Butzer, Inc., Jefferson City, MO $485,000.00 February 11, 2014 d. Construction contract for hvac renovation – change order no. 1 Harold G. Butzer, Inc., Jefferson City, MO $117,235.00 May 29, 2014 Work is 75% completed. Small Ruminant Building at Busby Farm a. Architect/engineering contract for design of new building The Architects Alliance, Inc., Jefferson City, MO $62,550.00 September 27, 2013 Design work is completed. Project will bid once approval of the PEA is received from NIFA. Construction contract to be submitted to NIFA for approval following receipt of bids. Minor Repairs/Renovations a. Pre-Environmental Assessment for Teaching Greenhouse renovation Midwest Environmental Consultants, Jefferson City, MO $2,500.00 September 27, 2013 Work is 100% completed. b. Bennett Hall New Door Installation Fischer Glass, Jefferson City, MO $14,909.70 September 27, 2013 Work is 100% completed. c. Solar pump enclosure at Busby Farm Hostetler & Sons, Linn, MO $6,450.31 October 23, 2013 Work is 100% completed. As of 8/31/14, the remaining unreleased funds for FY08 – FY12 are $609,932.92. Of the allowable 10% Emergency Acquisitions funds, $10,253.92 was used this past reporting period. A balance of $104,120.83 remains for this purpose. The following is a performance report for the work during the past twelve months (9/1/2013 to 8/31/2014) as related to the objectives identified and approved with the FY13 NIFA grant proposal. The grant number assigned to this five-year block of funding is 2013-45200-21362. Accessible Entrance Ramp – Founders Hall a. Construction of new accessible ramp at Founders Hall Wisch & Vaughan Construction, Jefferson City, MO $58,400 May 29, 2014 Project is 90% completed. Work to be completed by 11/30/14. Dickinson Research Center Expansion Project a. Architectural/engineering design firm for Dickinson Research Center Expansion PGAV Architects, Kansas City, MO $126,600 May 29, 2014 Construction documents are 90% completed. Pre-environmental assessment is being completed, and will be sent to NIFA for approval in order to proceed with bidding the project. As of 8/31/14, the remaining unreleased funds for FY13 are $910,073.00. Of the allowable $50,000 Emergency Acquisitions funds, $5,087.98 was used this past reporting period. A balance of $44,912.02 remains for this purpose.